SAEA Labor Tarrif

Excerpts from the minutes of the regular meeting of the board of directors of SOCOTECO-1 duly held at Edita S. Bueno Hall, SOCOTECO-1 Head Office, Brgy. Morales, City of Koronadal on May 08, 2015, 9:00AM

PRESENT: All District board of directors and the SOCOTECO-1 General Manager

The Approved New Schedule of Labor Tariff of SOCOTECO-1 Accredited Electrician

JOB DESCRIPTION TYPE OF INSTALLATION
SURFACE TYPE FLUSH TYPE/ CONDUIT
NEW REPAIR NEW REPAIR
SERVICE DROP WIRE # 6/7 DUPLEX 1 – 50 MTS. 100.00
EXCESS OF 50 MTS. 4.00 / M
SERVICE DROP WIRE # 4/7 DUPLEX 1 – 50 MTS. 200.00
EXCESS OF 50 MTS. 5.00 / M
SERVICE DROP WIRE # 2/7 DUPLEX 1 – 50 MTS. 500.00
EXCESS OF 50 MTS. 7.00 / M
SERVICE ENTRANCE W/ METER BOX AT STEEL POLE 500.00
METER POLE W/ ENTRANCE & CIRCUIT BREAKER 600.00
MOUNTING OF METER POLE ASSEMBLY 150.00
SERVICE ENTRANCE AT LOAD SIDE 100.00 75.00 200.00 100.00
SAFETY SWITCH DPST 30 AMP. 150.00 100.00 250.00 150.00
SAFETY SWITCH DPST 60 AMP. 200.00 100.00 250.00 150.00
SAFETY SWITCH DPDT 30 AMP. 250.00 150.00 350.00 200.00
SAFETY SWITCH DPDT 60 AMP. 350.00 150.00 500.00 250.00
LIGHTING OUTLET, CEILING FAN. 75.00 (NM) 50.00 200.00 100.00
CONVENIENCE OUTLET 75.00 (NM) 50.00 200.00 100.00
THUMBLER SWITCH SINGLE POLE 75.00 (NM) 50.00 200.00 100.00
3 WAY SWITCH 100.00 (NM) 75.00 250.00 100.00
PANELBOARD 4 TO 10 HOLES PLUG IN TYPE 300.00 500.00
PANELBOARD 10 TO 12 HOLES PLUG IN TYPE 400.00 800.00
PANELBOARD WITH CENTER MAIN 10 – 14 BRANCHES 800.00 MIN 1500.00 MIN
MAIN CIRCUIT BREAKER 100 – 200 AMP. 10.00 PER AMP. 10.00 PER AMP.
BRANCH CIRCUIT BREAKER 8.00 PER AMP. 8.00 PER AMP.
TELEPHONE OUTLET 150.00 75.00 200.00 100.00
CABLE TV OUTLET 150.00 75.00 200.00 100.00
ACU OUTLET 250.00 100.00 350.00 150.00
ELECTRIC MOTOR OUTLET 250.00 100.00 350.00 150.00
WASHING MACHINE OUTLET 250.00 100.00 300.00 150.00
LAN OUTLET ( COMPUTER NETWORK ) 200.00 100.00 250.00 100.00
PLASTIC MOULDING OR MOULDINGS 50.00/LENGTH
UNDERGROUND SERVICE ENTRANCE FOR #8 mm 750.00 MINIMUM 1 – 10 MTS
STEEL POLE FABRICATION ( WELDING WORKS ) 250.00 PER POLE
PERCENTAGE BASIS ( DIRECT LABOR COST ) 35% OF THE TOTAL MATERIAL COST